About the Project

In an ongoing effort to provide quality wireless service, Verizon Wireless has identified your community as one that will benefit from improved network coverage. 

Milestone Towers is proposing a wireless telecommunications facility at Belmont Interchange or at the junction of Route 7 and Route 901. 

The proposal is for a 150-foot monopole and will include ground equipment required to operate the facility. 

This equipment will be located at the base of the structure in a secure fenced area. Verizon Wireless will be the first wireless carrier to locate on the proposed tower.

Update #8: Milestone Towers will go before the Planning Commission at an upcoming work session – date TBD. Please check back for updates. Project documents submitted to the County can be found here

Update #7: Milestone Towers will go before the Planning Commission on Tuesday, July 30th at 6:00pm.

Update #6: 2nd Balloon Fly – SUNDAY, APRIL 21st.

Given the forecast of high winds Saturday, April 20th the balloon fly will take place on SUNDAY, APRIL 21st 8:00 am – 12:00 pm.  Please feel free to pass this update along to any neighbors or interested parties. 

For safety reasons, please do not park or walk along or in the right-of-way where the balloon is being flown.

Update #5: Please click here to view the online Town Hall Presentation held Thursday, March 28th.

DMB Engineering completed an electromagnetic (radio frequency) exposure analysis for the proposed tower site at Belmont Interchange. The report concludes that the tower, with Verizon Wireless and future wireless carriers installed, will be in compliance with the US federal human exposure limits by a wide margin. The PDF version of the report is available for review here.

In response to a comment/question during the Town Hall meeting, below are the details for the four active tower applications Milestone has submitted within the County:

  • LEGI-2023-0083

  • LEGI-2023-0092

  • LEGI-2023-0093

  • LEGI-2023-0094

Update #4: Balloon Fly – POSTPONED DUE TO WEATHER 

Given the forecast of inclement forecast for the upcoming weekend, we are postponing the balloon fly to the weekend of April 20th.  The Town Hall will continue as scheduled on March 28th at 6PM.

The new balloon fly date is Saturday, April 20th 8:00 am – 12:00 pm with weather reschedule date of Sunday, April 21st (8am-12pm). 

 

Please feel free to pass this update along to any neighbors or interested parties.  In addition, a notice will be mailed with the new schedule.  

 
(THE DECISION TO RESCHEDULE WILL BE MADE BASED ON THE WEATHER FORECAST AND POSTED HERE ON THE HOME PAGE BY 6 PM FRIDAY, APRIL 19TH.)
 

Update #3: Our rescheduled events are shown below.

Community Balloon Fly: On Saturday, March 23rd from 8:00 am – 12:00 pm a balloon will be flown at the proposed location and height to provide a visual reference for the tower.

Online Town Hall: On Thursday, March 28th @ 6:00 pm we will hold an online Town Hall webinar consisting of a short presentation followed by a question and answer time. Registration is required and can be completed on the Town Hall page.

(IN CASE OF BAD WEATHER THE BALLOON FLY WILL BE RESCHEDULED FOR SUNDAY, March 24TH FROM 8:00 AM TO 12:00 PM. THE DECISION WILL BE MADE BASED ON THE WEATHER FORECAST AND POSTED HERE ON THE HOME PAGE BY 6 PM FRIDAY, March 22nd.).

Update #2: IMPORTANT In order to include additional community members, we have postponed the Balloon Fly and the Town Hall meeting. We are currently working to reschedule the event and will provide updated details as soon as possible. We will be sending out two notices which will include the new dates and times. Thank you for your patience.

Update #1: There are two upcoming community events:

Community Balloon Fly: On Saturday, February 24th from 8:00 am – 12:00 pm a balloon will be flown at the proposed location and height to provide a visual reference for the tower.

Online Town Hall: On Tuesday, February 27th @ 6:00 pm we will hold an online Town Hall webinar consisting of a short presentation followed by a question and answer time. Registration is required and can be completed on the Town Hall page.

(IN CASE OF BAD WEATHER THE BALLOON FLY WILL BE RESCHEDULED FOR SUNDAY, FEBRUARY 25TH FROM 8:00 AM TO 12:00 PM. THE DECISION WILL BE MADE BASED ON THE WEATHER FORECAST AND POSTED HERE ON THE HOME PAGE BY 6 PM FRIDAY, FEBRUARY 23rd.)

Our Process

1. Due Diligence 

Survey, FAA, FCC, NEPA, Phase 1, Geotechnical Analysis.

2. Land Use

Special Exception Permit Application, Community Meeting, Staff Review, Planning Commission, Board of Supervisors..

3. Permitting

Conduct Bid Walk With Contractors, submit Site Plan and Building permit applications.

4. Construction 

Tower construction = 4-6 weeks  | Carrier construction = 4-6 weeks on average

On-site supervision by Construction Manager 

 

5. Site Maintenance

Four visits per year for site maintenance | Remove trash, debris, check signage. 

2-4 visits per year for carrier modifications. 

About Us

With over 20 years experience, Milestone Towers is the leading developer of wireless infrastructure and cell towers in partnership with school, government and utility landowners.